Projects to Increase the Flow in Mula River Spring through the Technique of Horizontal Well

Authors

  • José Antonio López Fernández
  • José María Gómez Espín
  • Encarna Gil Meseguer
Keywords: qanat, Mula river, South-east of Spain

Abstract

Throughout the twentieth century, several projects (1931, 1943 and 1969) of construction of a horizontal well (gallery) were developed, in order to increase the Mula river flow in its upper stretch.

Downloads

Download data is not yet available.
Published
07-11-2015
How to Cite
López Fernández, J. A., Gómez Espín, J. M., & Gil Meseguer, E. (2015). Projects to Increase the Flow in Mula River Spring through the Technique of Horizontal Well. Murcian Journal of Anthropology, (22), 137–160. Retrieved from https://revistas.um.es/rmu/article/view/241031